A study of the Toyota production system from an industrial engineering viewpoint
Material type:
- 9780915299171
- 658.5 Sh63sE
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
![]() |
PK Kelkar Library, IIT Kanpur | General Stacks | 658.5 Sh63sE (Browse shelf(Opens below)) | Available | A172419 |
Total holds: 0
Browsing PK Kelkar Library, IIT Kanpur shelves, Collection: General Stacks Close shelf browser (Hides shelf browser)
![]() |
No cover image available |
![]() |
![]() |
![]() |
No cover image available | No cover image available | ||
658.5 Se31m Multi stage simultaneous lot sizing and scheduling | 658.5 SE71H HINDUSTAN MACHINARY MANUFACTURING LTD. | 658.5 SH23T TQM IN INDIAN ENGINEERING INDUSTRIES | 658.5 Sh63sE A study of the Toyota production system from an industrial engineering viewpoint | 658.5 Sk34m MANUFACTURING | 658.5 So16m Managing supply chain risk | 658.5 St15p2 PRODUCTION AND OPERATIONS MANAGEMENT |
There are no comments on this title.
Log in to your account to post a comment.