000 | 00657pam a2200217a 44500 | ||
---|---|---|---|
003 | OSt | ||
005 | 20221027122051.0 | ||
008 | 160408b xxu||||| |||| 00| 0 eng d | ||
040 | _cIIT Kanpur | ||
041 | _aeng | ||
082 |
_a001.424 _bL497 |
||
245 | 1 |
_aMulti-stage production planning and inventory control _cedited by S. Axsäter, Ch. Schneeweiss and E. Silver. |
|
260 |
_aBerlin _bSpringer _c1986 |
||
300 | _a264p | ||
440 | _aLecture notes in economics and mathematical systems ; 266 | ||
650 | _aPlanning and inventory control | ||
700 | _aAxsäter, S [ed.] | ||
700 | _aSchneeweiss, Ch [ed.] | ||
700 | _aSilver, E [ed.] | ||
942 | _cBK | ||
999 |
_c286166 _d286166 |